Asset Report

Mian Xian (Bayi) zinc smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Zinc smelting commenced in 1999 with a capacity of 7kt/a slab zinc. The smelter processed calcine produced on redundant equipment at the Bayi copper mine. The first fluid bed roaster was built at Mian Xian in 2000 and the tankhouse was expanded to provide a total capacity of 25kt/a slab zinc.  Further expansions have taken the plant capacity to 330kt/a slab zinc. These included the building of a twin zinc smelter adjacent to the original in 2008.

What's included

This report contains

  • Document

    Mian Xian (Bayi) zinc smelter

    PDF 585.05 KB

  • Document

    Mian Xian (Bayi) zinc smelter.xls

    XLS 518.50 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Process overview
  • Products
  • Costs
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Tables

  • Key facts: Table 1
  • Feed preparation
  • Roaster & Acid plant
  • Leaching & Purification
  • Tankhouse, melting & Casting
  • Products: Table 1
  • Products
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Location maps: Image 1
  • Flowsheet
  • Production
  • Costs: Image 1

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800