Asset Report
Montana Tunnels Restart gold mine
Report summary
Montana Tunnels is a generally high cost producer with a long history of dipping in and out of production. The accompanying analysis covers the Montana Tunnels Restart and the Gold Dream Project and excludes the East Butte and Diamond Hill deposits which Eastern Resources is targeting for later development. Full annual production from both the Montana and Golden Dream deposits is expected to be 105koz Au, 500koz Ag, 35Mlb Zn, 12.5Mlb Pb and 2Mlb Cu.
Table of contents
- Summary
- Key issues
- Emissions
- Mining
- Processing
Tables and charts
This report includes 2 images and tables including:
- Montana Tunnels Restart Emission Intensity Quartile Ranking - total global production - tonnes Zn equivalent
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Montana Tunnels Restart zinc mine
A detailed analysis of the Montana Tunnels Restart zinc mine.
$2,250
Asset Report
Syama Restart gold mine
A detailed analysis of the Syama Gold Mine.
$2,250
Asset Report
Montana Tunnels (Closed) gold mine
A detailed analysis of the Montana Tunnels gold mine.
$2,250