Asset report

Mufulira copper refinery

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The refinery is located at Mufulira on the Zambian Copperbelt adjacent to the Mufulira Smelter. Road and rail links to other Zambian smelters and export ports are adequate. The first tankhouse unit was commissioned in 1952 with a capacity of 36kt/a cathode and a second identical unit was added in 1955. By 1957 the capacity of these units had increased to 104kt/a. In 1956 a two reverberatory furnace wirebar plant was commissioned. Initial wirebar capacity was also 104kt/a although this...

What's included

This report contains

  • Document

    Mufulira copper refinery

    PDF 494.04 KB

  • Document

    Mufulira copper refinery.xls

    XLS 694.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 8 images and tables including:

Images

  • Detailed map
  • Products: Image 1
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in

Asset report

North Mara gold mine

Asset report

Buzwagi gold mine

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898