Asset Report

Mufulira copper smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Mufulira copper smelter

Report summary

The Mufulira smelter was commissioned in 1937 with two green fed reverberatory furnaces and four Peirce-Smith converters.  Blister copper was exported for refining.  In 1952 two anode furnaces and a casting wheel were installed to provide anodes to the new Mufulira refinery.  In 1956 an additional reverberatory furnace, converter and duplicate anode casting facilities were added to cope with increasing production from RST mines. In 1971 the electric furnace was installed to take advantage of...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Feed preparation
    • Environmental
    • Products allocation
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Flowsheet
  • Production
  • Products: Table 1
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 2

What's included

This report contains:

  • Document

    Mufulira copper smelter

    PDF 1012.40 KB

  • Document

    Mufulira copper smelter.xls

    XLS 409.50 KB

Other reports you may be interested in

Browse reports by Industry Sector