Asset report

Mufulira copper smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Mufulira smelter was commissioned in 1937 with two green fed reverberatory furnaces and four Peirce Smith converters. Blister copper was exported for refining. In 1952 two anode furnaces and a casting wheel were installed to provide anodes to the new Mufulira refinery. In 1956 an additional reverberatory furnace converter and duplicate anode casting facilities were added to cope with increasing production from RST mines. In 1971 the electric furnace was installed to take advantage of...

What's included

This report contains

  • Document

    Mufulira copper smelter

    PDF 558.01 KB

  • Document

    Mufulira copper smelter.xls

    XLS 475.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Feed preparation
    • Environmental
    • Products allocation
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Products: Table 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Products: Table 2

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898