Asset Report

Nchanga copper minesite

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Nchanga concentrator derives its feed from the Nchanga and Chingola Open Pits and the Nchanga underground operations. Flotation tailings from the concentrator are acid leached to recover acid soluble copper, and upgraded to cathode in the Tailings Leach Plant (TLPIII) SxEw facility that also reprocesses dam tailings dump material. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions
    • Underground
    • Upper Ore Body
    • Open Pit
    • Mill
    • Tailings Leach
    • SxEw
    • Nchanga Refractory Ore

Tables and charts

This report includes the following images and tables:

  • Nchanga Emission Intensity Quartile Ranking - total global production - tonnes Cu equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Nchanga copper minesite

    XLS 443.00 KB

  • Document

    Nchanga copper minesite

    PDF 1.65 MB