Asset Report

Nchanga copper smelter

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The smelter was constructed at Chingola in Zambia to take advantage of the existing processing plant infrastructure.  It is also closer to the Konkola mines than the Nkana smelter which was closed following the successful commissioning of this smelter.  The Konkola deep mining project which was brought into production in 2010 is expected to provide adequate feed stock to Nchanga for many years.  Other sources of concentrate are the older Konkola and Nchanga mines.  The installed capacity is...

What's included

This report contains

  • Document

    Nchanga copper smelter

    PDF 545.73 KB

  • Document

    Nchanga copper smelter.xls

    XLS 478.00 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898