Asset Report

Nchanga copper smelter

Get this report

$1,350

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

09 June 2017

Nchanga copper smelter

Report summary

The smelter was constructed at Chingola in Zambia to take advantage of the existing processing plant infrastructure.  It is also closer to the Konkola mines than the Nkana smelter which was closed following the successful commissioning of this smelter.  The Konkola deep mining project which was brought into production in 2010 is expected to provide adequate feed stock to Nchanga for many years.  Other sources of concentrate are the older Konkola and Nchanga mines.  The installed capacity is...

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
    • Environmental
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Flowsheet
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Production
  • Products: Table 1
  • Products allocation
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1

What's included

This report contains:

  • Document

    Nchanga copper smelter

    PDF 1000.11 KB

  • Document

    Nchanga copper smelter.xls

    XLS 410.50 KB

Other reports you may be interested in

Browse reports by Industry Sector