Asset Report

Pubei (Closed) zinc mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Mining capacity is ~45kt/a and milling capacity is rated at ~245kt/a ore. To maximise utilisation of the mill, additional ore is sourced from other small scale mines in the area. Mill utilisation rates are low at around 50%. The mill is expected to close on exhaustion of the Pubei resource in 2013. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains: