Asset report

Ray copper minesite

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Ray complex consists of various assets at Ray and Hayden which are 30km apart and connected by rail. At Ray operations consist of a 27.7kt/d (32kst/d) concentrator an open pit mine an SxEw plant and leach dumps. At Hayden operations include a 22.5kt/d (27kst/d) concentrator and a copper smelter. Crushed sulphide ore from Ray is either railed to the Hayden concentrator or conveyed after in pit crushing to the Ray concentrator. Oxide material is mined and placed on dedicated leach...

What's included

This report contains

  • Document

    Ray copper minesite

    XLS 583.00 KB

  • Document

    Ray copper minesite

    PDF 461.28 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Reserves and resources
  • Production
  • Costs
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898