Asset Report

Ridgeway (Closed) gold mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The operation closed in 1999. The property was subject to a 3.2% production royalty. Reclamation of the site should be finished by 2013, when North and South pits have been filled to create recreational lakes. Water and the water table will continue to be monitored until about 2030. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Mining
  • Process

Tables and charts

No table or charts specified

What's included

This report contains:

  • Document

    Ridgeway (Closed) gold mine

    XLS 112.50 KB

  • Document

    Ridgeway (Closed) gold mine

    PDF 1.18 MB