Asset Report

San Martin Restart zinc mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

San Martin was on strike since July 2007 and has re-started its mine operations (commissioning) in April 2019. In 2020 the milled production was 1.36Mt of ore reaching almost full capacity of the mill (4kt/d ore). For 2021 the plan was to mill 1.37Mt and future years the plan was to get full capacity at 1.54Mt ore. This was expected to be possible because they have started to operate the San Martin shaft. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • Royalties and taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    San Martin Restart zinc mine

    XLS 428.50 KB

  • Document

    San Martin zinc mine

    XLS 366.50 KB

  • Document

    San Martin Restart zinc mine project

    PDF 1.23 MB

  • Document

    San Martin Restart zinc mine project

    ZIP 1.17 MB