Savage River iron ore mine
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Mary River iron ore mine
Operating at Mary River requires navigating Arctic logistics constraints, with exports dependent on a short seasonal shipping window.
$2,250Nimba (Yekepa) Phase 2 iron ore mine
ArcelorMittal's Nimba Phase 2 expansion produced the first concentrate in late 2024.
$2,250Simandou (Blocks 3 and 4) iron ore mine
Rio Tinto delivered first ore in late 2025, with exports commencing in 2026 as the operation entered its ramp-up phase.
$2,250