Scunthorpe (BOF) steel plant
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Steel plant overview
- Iron ore
- Coal
- Coke
- Metallics
-
Energy
- Finished steel production
- Capital costs
- Operating cash costs
Tables and charts
This report includes the following images and tables:
-
Detailed mapParticipationDownstream products
-
Capital costsTotal operating cash costs - Finished steelOperating cash cost tableKey raw materials ratesProduction table (Mt)
What's included
This report contains:
Other reports you may be interested in
Port Talbot (BOF) steel plant
Tata Steel will halt its blast furnace operations by September 2024 as part of its strategic shift towards low-carbon EAF steel production.
$2,250Middletown steel plant
Single blast furnace steel plant producing flat-rolled and coated sheet. The planned DRI-EAF project was cancelled on weak economics.
$2,250Dearborn steel plant
Dearborn is a steel mill operated by Cleveland-Cliffs that focuses on the production of high-strength, light-weight steel products.
$2,250