Asset Report

Tamano copper smelter

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The smelter was originally built on a greenfield site in 1972. In 1975 the lime scrubbing plant was installed to reduce the pollution from fugitive fume. Production capacity was expanded by the addition of an oxygen plant in 1981. Further capacity increases were achieved in 1984 by the addition of a second oxygen plant and at the same time acid plant tailgas was routed to the lime scrubbing plant, achieving an overall sulphur fixation over 99.9%. During 1989/90 the converters were...

Table of contents

  • Flowsheet
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Environmental

Tables and charts

This report includes 4 images and tables including:

What's included

This report contains:

  • Document

    Tamano copper smelter

    PDF 1.60 MB

  • Document

    Tamano copper smelter

    ZIP 1.18 MB