Asset report

Tamano copper smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The smelter was originally built on a greenfield site in 1972. In 1975 the lime scrubbing plant was installed to reduce the pollution from fugitive fume. Production capacity was expanded by the addition of an oxygen plant in 1981. Further capacity increases were achieved in 1984 by the addition of a second oxygen plant and at the same time acid plant tailgas was routed to the lime scrubbing plant achieving an overall sulphur fixation over 99.9%. During 1989/90 the converters were...

What's included

This report contains

  • Document

    Tamano copper smelter

    PDF 626.62 KB

  • Document

    Tamano copper smelter.xls

    XLS 482.50 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Process overview
  • Products
  • Costs
  • Economic assumptions

Tables and charts

This report includes 13 images and tables including:

Images

  • Detailed map
  • Flowsheet
  • Production
  • Costs: Image 1

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Feed preparation
  • Smelting process
  • Auxiliary plants
  • Products: Table 1
  • Products allocation
  • Costs: Table 1
  • Economic assumptions: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898