Asset report

Tambo Grande copper mine project

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The project has been abandoned since 2004 and no mining activity is allowed in the area. The character of the accompanying analysis is just speculative. It assumes an old plan that included a mine mill 8kt/d ore plant to treat oxide ore to recover gold as dore and after the third year of operation to operate a 20kt/d plant to produce copper and zinc concentrates.

What's included

This report contains

  • Document

    Tambo Grande copper mine project

    XLS 507.00 KB

  • Document

    Tambo Grande copper mine project

    PDF 531.83 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Operations
  • Costs
  • Fiscal and regulatory
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898