Asset Report

Tambo Grande gold mine project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The project has been abandoned since 2004 and no mining activity is allowed in the area. The character of the accompanying analysis is just speculative. It assumes al old plan that included a mine-mill 8kt/d ore plant to treat oxide ore to recover gold as dore and after the third year of operation to operate a 20kt/d plant to produce copper and zinc concentrates. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Process
  • CAPEX
  • Royalties and taxes

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Tambo Grande gold mine project

    XLS 109.50 KB

  • Document

    Tambo Grande gold mine project

    PDF 1.20 MB

  • Document

    Tambo Grande gold mine project

    ZIP 1.02 MB