Asset Report
Tongkeng Dachang zinc mine
Report summary
Tongkeng was formerly known as Nandan Dachang No.92, and reported separately from No. 100. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key Issues
- Detailed map
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Pine Point zinc mine project
A detailed analysis of the Pine Point zinc mine project.
$2,250
Asset Report
Gaofeng (100 mine) zinc mine
A detailed analysis of the Gaofeng (100 mine) zinc mine.
$2,250
Asset Report
Guangxi Other zinc mine
It is the combined production from numerous small mines in Guangxi province which we do not include as individual assets in cost service.
$2,250