Asset Report

Trail zinc smelter

Get this report

$1,800

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

29 November 2018

Trail zinc smelter

Report summary

The Trail zinc smelter located in British Columbia, Canada is an electrolytic zinc smelting operation has both the typical Roast-Leach-Electrowin flowsheet alongside the direct pressure leaching of concentrates. It is operated by Teck Resources Ltd (Teck), previously known as Teck Cominco and has a slab zinc production capacity of 295kt/a.

Table of contents

Tables and charts

This report includes 14 images and tables including:

  • Key facts: Table 1
  • Detailed map
  • Participation: Table 1
  • Production
  • Products: Table 1
  • Costs: Image 1
  • Costs: Table 1
  • Economic assumptions: Table 1
  • Process overview: Image 1
  • Process overview: Table 1
  • Process overview: Table 2
  • Process overview: Table 3
  • Process overview: Table 4
  • Products: Table 2

What's included

This report contains:

  • Document

    Trail zinc smelter.xls

    XLS 473.00 KB

  • Document

    Trail zinc smelter

    PDF 1.04 MB