Asset Report

Tulsequah Chief zinc mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Tulsequah Project located in northwestern British Columbia, Canada. The project encompasses two polymetallic massive sulphide deposits, Tulsequah Chief and Big Bull. The feasibility study released in November 2014 focused solely on the Tulsequah Chief deposit, thus the accompanying profile does not consider the Big Bull deposit. The 2014 feasibility study differs from the 2012 feasibility study, in that it proposes a lower processing rate of 1,100t/d as opposed to the initially anticipated 2,000t/d. In September 2016, Chieftain Metals Corp. went into receivership. The company has remained in receivership and the start-up of the mine has been moved to a tentative 2030.

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • CAPEX
  • Mining
  • Process

Tables and charts

This report includes the following images and tables:

  • Tulsequah Project Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
  • Detailed map

What's included

This report contains:

  • Document

    Tulsequah Chief Project zinc mine

    XLS 383.50 KB

  • Document

    Tulsequah Chief zinc mine project

    PDF 1.62 MB