Asset Report
Wasamac gold mine project
Report summary
Wasamac is planned as an underground operation using longhole stoping methods with cemented backfill for primary stopes and un-cemented backfill for secondary stopes. Life of mine (LOM) is estimated at 14 years at an ore production rate of 2.5kt/d, ramping up to 6kt/d in year 3. The process plant will comprise a conventional carbon in pulp (CIP) circuit with an estimated capacity of 2.1Mt/a. Gold production is estimated at around 142 koz per annum.
Table of contents
- Summary
- Key issues
- Mining
- Processing
- CAPEX
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Salares Norte gold mine project
A detailed analysis of the Salares Norte gold mine project
$2,250
Asset Report
Springpole gold mine project
A detailed analysis of the Springpole gold mine project
$2,250
Asset Report
Black Volta gold mine project
A detailed analysis of the Black Volta gold mine project.
$2,250