Asset Report

Wasamac gold mine project

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Wasamac is planned as an underground operation using longhole stoping methods with cemented backfill for primary stopes and un-cemented backfill for secondary stopes. Life of mine (LOM) is estimated at 14 years at an ore production rate of 2.5kt/d, ramping up to 6kt/d in year 3. The process plant will comprise a conventional carbon in pulp (CIP) circuit with an estimated capacity of 2.1Mt/a. Gold production is estimated at around 142 koz per annum.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Processing
  • CAPEX

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains:

  • Document

    Wasamac gold mine project

    XLS 116.50 KB

  • Document

    Wasamac gold mine project

    PDF 1.28 MB