Asset report

Wasamac gold mine project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Wasamac is planned as an underground operation using longhole stoping methods with cemented backfill for primary stopes and un cemented backfill for secondary stopes. Life of mine (LOM) is estimated at 14 years at an ore production rate of 2.5kt/d ramping up to 6kt/d in year 3. The process plant will comprise a conventional carbon in pulp (CIP) circuit with an estimated capacity of 2.1Mt/a.Gold production is estimated at around 140 thousand ounces per annum.

What's included

This report contains

  • Document

    Wasamac gold mine project

    XLS 125.50 KB

  • Document

    Wasamac gold mine project

    PDF 466.88 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Costs
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898