Asset report

Yunnan (P) aluminium smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

With the permanent closure of the Søderberg lines in 2004 Yunnan became an exclusively prebake operation. The Runxin and Yongxing smelters are included in the Yunnan costing from 2007.

What's included

This report contains

  • Document

    Yunnan (P) aluminium smelter

    XLS 99.50 KB

  • Document

    Yunnan (P) aluminium smelter

    PDF 315.33 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Raw materials
  • Process overview
  • Products
  • Timeline

Tables and charts

This report includes 3 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1
  • Process overview: Table 1

You may be interested in?

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898