Asset Report

Zanjan zinc smelter project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The smelting of Angouran ore and the minesite was first proposed in 2000 with a smelter likely to come on line in 2006. However the economics of selling the ore still outweigh the construction of a smelter, and so this project is very unlikely to go ahead.

What's included

This report contains

  • Document

    Zanjan zinc smelter project

    PDF 1.04 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
  • Products

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Location maps: Image 1
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898