Asset Report

Moesian Platform shale gas unconventional concept play (Bulgaria)

Get this report

$2,200

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

In an early stage assessment, LNG Energy predicted that the Moesian Platform has 7.2 tcf gross prospective recoverable resources. As a result, supermajor Chevron entered Bulgaria with the hope to commercialise Bulgaira's unconventional potential. However, since 2012, progress has slowed. The government introduced a hydraulic fracturing moratorium, limiting the ability for operators to commercially produce the target formations. As a result, Chevron exited and exploration in the basin has ground to a halt.

Table of contents

  • Commercialisation overview
  • What to watch
  • Chevron
  • Sterling Resources
  • TransAtlantic Petroleum
    • Location
    • Formation

Tables and charts

This report includes 1 images and tables including:

  • Moesian Platform shale map

What's included

This report contains:

  • Document

    Moesian Platform shale gas unconventional concept play (Bulgaria)

    PDF 1.47 MB