Asset Report

A/6-F/3 Pipeline

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Wintershall Noordzee operated A/6-F/3 gas gathering system was built to transport gas from the German A/6-B/4 gas fields and potential field developments in the far north of the Dutch sector. In addition to the gas pipeline, a condensate pipeline was also constructed. Both pipelines run from the A/6-B/4 field to the F/3-FB platform via the tertiary shallow A&B gas fields in the Netherlands, before connecting to the NOGAT System. Production from this area started in December 2007. ...

Table of contents

Tables and charts

This report includes the following images and tables:

    Key facts: Table 1A/6-F/3 pipeline mapParticipation: Table 1
    Throughput: Table 1Throughput: Table 2A/6-F/3 Pipeline throughput profileEconomic analysis: Table 1Economic analysis: Table 2Economic analysis: Table 3Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026
  • 4 more item(s)...

What's included

This report contains:

  • Document

    A/6-F/3 Pipeline

    PDF 1.17 MB

  • Document

    A/6-F/3 Pipeline

    XLS 568.50 KB