Asset Report

A/6-F/3 Pipeline (D)

Get this report

$4,400

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The A/6-F/3 gas gathering system transports gas from the German A/6-B/4 gas field and other potential developments in the far north of the Dutch sector. In addition to the gas pipeline, a condensate pipeline has also been constructed, and both pipelines were commissioned in September 2000. The pipelines terminate at the F/3-FB platform, 118 kilometres southeast in the Dutch Sector. F/3-FB is the start of the NOGAT gas pipeline, which transports gas onwards to the Den Helder terminal in the ...

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Pipelines
    • Terminal
  • Throughput
    • Tariffs

Tables and charts

This report includes 5 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Participation: Table 1
  • Gas Throughput Profile
  • Throughput: Table 1

What's included

This report contains:

  • Document

    A/6-F/3 Pipeline (D)

    PDF 1.11 MB

  • Document

    A/6-F/3 Pipeline (D)

    XLS 165.00 KB