Asset report

A/6-F/3 Pipeline (D)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The A/6-F/3 gas gathering system was built to transport gas from the German A/6-B/4 gas field and other potential developments in the far north of the Dutch sector. In addition to the gas pipeline, a condensate pipeline has also been constructed, and both pipelines were commissioned in September 2000. The pipelines terminate at the F/3-FB platform, 118 kilometres southeast in the Dutch Sector. F/3-FB is the start of the NOGAT gas pipeline, which transports gas onwards to the Den Helder ...

What's included

This report contains

  • Document

    A/6-F/3 Pipeline (D)

    PDF 391.81 KB

  • Document

    A/6-F/3 Pipeline (D)

    XLS 140.50 KB

  • Document

    A/6-F/3 Pipeline (D)

    ZIP 498.66 KB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Participation
    • Pipelines
    • Terminal
  • Throughput
    • Tariffs
  • Economic assumptions

Tables and charts

This report includes 5 images and tables including:

Images

  • Index Map
  • Gas Throughput Profile

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Throughput: Table 1

You may be interested in

Asset report

Barryroe

Asset report

Maclure

Asset report

Scott Area

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898