Al Khalij (Block 6)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Source rock
- Reservoir
- Cap rock
- Oil quality
- PSC production
- Concession production
- Emissions
-
Al Khalij redevelopment programme
- Wells
- Processing facilities
- Pipelines
-
Historical development
- Phase one
- Phase two
- Phase three
- Exploration Costs
- Capital Costs
- PSC costs
- Concession costs
- Operating Costs
- 7 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapConcession participation
-
Production (2005-2014)PSC Production ProfileProduction (2015-2024)Concession Production ProfileCapital Costs Pre-2007 to 2014 (US$ million)Capital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2029 (US$ million)Cash Flow (US$)PV Table (US$)
- 16 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Al Yasat Contract Area
The Al Yasat Petroleum joint venture (JV) between ADNOC and CNPC operates two concession areas in Abu Dhabi - one fully offshore and ...
$3,720Al Taweelah alumina refinery
A detailed analysis of the Shaheen alumina refinery.
$2,250G2/61 (Bongkot)
Block G2/61, covering 3,247 km2, is located in the Gulf of Thailand. The block is divided into three areas: Area A, Area B1 and Area ...
$3,720