Asset Report
Block 15 Kizomba B
Report summary
Block 15 is a deepwater block located 120 kilometres offshore Angola in the Lower Congo Basin. The Kizomba B development area was sanctioned in 2003 and exploits the Dikanza and Kissanje fields. It was the third development on the block after Xikomba and Kizomba A. The fields were developed using a tension leg platform (TLP) tied back to a floating production, storage and offloading vessel (FPSO)..
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
-
Exploration
- Seismic
- Reserves and resources
- Production
-
Development
- Facilities
- Drilling
- Dikanza expansion
- Kizomba Satellites Phase 1
- Kizomba Satellites Phase 2
- Bavuka expansion
- Infrastructure
-
Costs
- Exploration costs
- Abandonment costs
- Capital costs
- Operating costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Global Economic Model (GEM) File
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 35 images and tables including:
- Key facts: Table 1
- Index map
- Kizomba B map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Kizomba B production profile
- Kizomba B (pre-2020) production profile
- Kizomba Satellites Ph. 1 (pre-2020) production profile
- Kizomba Satellites Ph. 2 (pre-2020) production profile
- Fiscal and regulatory: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Block 15 Kizomba B cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2022
- Remaining Present Value Price Sensitivities
- Block 15 Kizomba B (pre-2020) cash flow
- Economic analysis: Table 5
- Economic analysis: Table 6
- Split of Revenues
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2022
- Kizomba Satellites Phase 1 cash flow
- Economic analysis: Table 8
- Economic analysis: Table 9
- Kizomba Satellites Phase 2 cash flow
- Economic analysis: Table 11
- Economic analysis: Table 12
What's included
This report contains:
Other reports you may be interested in
26 January 2022
Block 15 Kizomba C
Asset Report
Block 15 Kizomba C
Block 15 is located 120 kilometres offshore Angola in deepwater. ExxonMobil operates the block and is partnered with BP, Eni, Equinor ...
$3,10004 February 2020
Block 15 Kizomba Satellites Phase 1
Asset Report
Block 15 Kizomba Satellites Phase 1
The Kizomba Satellites Phase 1 development comprises the Clochas and Mavacola fields in the prolific Block 15. In 2009, Sonangol ...
$3,10026 January 2022
Block 15 Kizomba A
Asset Report
Block 15 Kizomba A
Block 15 is located 120 kilometres offshore Angola in deepwater. ExxonMobil operates the block and is partnered with BP, Eni, Equinor ...
$3,100