Block 88
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Block 88 participation history
-
TGP pipeline
- Operating Costs
- Gas
- Liquids
- Tax breaks
- Cash flow
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026Production (2015-2024)Block 88 Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Block 58
Block 58 is located in the Ucayali basin, adjacent to Block 88, Block 57, and Block 56. Petrobras Energía Peru conducted ...
$3,720Block 57
Kinteroni and Sagari are two large gas/condensate fields in Peru's Block 57, located in the Ucayali basin. The block is near the ...
$3,720Block 56
Pagoreni and Mipaya are two large gas/condensate fields in Block 56 in the Ucayali Basin. Both Block 56 and neighboring Block 88 are ...
$3,720