Ewing Bank 998
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Exploration
- Reserves
- Production
- Transport
- Costs
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapField MapParticipation
-
Production (2020-2027)Production ProfileCapital Costs Pre-2022 to 2024 (US$ million)Operating Costs 2020 to 2027 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
- 3 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Ewing Bank 878
Ewing Bank 878 is a small oil and gas field located in the Ewing Bank protraction area. The field was initially developed as a two-well ...
$3,720Cleaver Bank High Project
The Cleaver Bank High Project comprises the Carrack and Cutter gas fields. The latter is tied back to Carrack, which is tied back ...
$3,720Lobster (EW873)
Lobster is a large oil and gas field located in the Ewing Bank protraction area of the Central Gulf of Mexico. First oil was achieved ...
$3,720