J-Area (Jade, Joanne, Judy, Jasmine & Talbot)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Talbot field development receives regulatory approval in March 2023
- Drilling campaign to stem production decline
- Jocelyn South exploration well planned for early 2024
- HP/HT nature of the fields presents continued risk
- J-Area could act as a hub for discoveries in the area
- Decarbonisation - potential electrification of the Central North Sea
- Location maps
- Participation
- Geology
- Well data
- Reserves and resources
-
Production
-
Emissions
- North Sea Transition Deal
- Decarbonisation - potential electrification of the Central North Sea
-
Emissions
-
Development
-
Key development metrics
- Judy
- Jasmine
- Jade
- Joanne
- Talbot
- Judy platform development
- Jade platform development
-
Jasmine platform development
- Historical drilling
-
Key development metrics
- Infrastructure
-
Costs
- J-Area capital costs
-
J-Area operating costs
- Tariffs
- Operating cost (opex) share
- Emissions Trading Scheme (ETS)
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Carbon price
- Exchange rate
- Fiscal terms
- Global Economic Model (GEM) file
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 31 images and tables including:
- Key facts: Table 1
- Index map
- J-Area map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- J-Area production profile
- Infrastructure: Table 1
- Sales contracts: Table 1
- Development: Table 1
- Development: Table 2
- Development: Table 3
- Development drilling
- Costs: Table 1
- Costs: Table 2
- Decommissioning costs
- Cash flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining Present Value Price Sensitivities
- Cash flow (£ million)
- Economic analysis: Table 5
- Economic analysis: Table 6
- Costs: Table 4
What's included
This report contains:
Other reports you may be interested in
Russia other fields (sub-commercial)
Sub-commercial fields contain hydrocarbon volumes that are discovered, recoverable and remaining but are not considered commercial.
$4,400Gassled-Langeled
The Langeled system is one of the longest subsea gas export lines in the world and connects the Nyhamna terminal to the UK.
$2,150Halilaga copper mine project
A detailed analysis of the Halilaga copper mine project.
$2,250