La Creciente
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Reserves downgrade
- Participation history
- Reservoir
- Hydrocarbon quality
- Facilities
- Wells
- Capital costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) file
- 1 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2015 to 2023 (US$ million)Cash Flow (US$)PV Table (US$)
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
La Oroya (closed) copper refinery
A detailed analysis of the La Oroya copper refinery.
$2,250La Oroya (closed) copper smelter
A detailed analysis of the La Oroya copper smelter.
$2,250La Libertad (Orosi) gold mine
A detailed analysis of the La Libertad (Orosi) gold mine.
$2,250