Los Perales-Las Mesetas
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Historic
-
Operating costs
- Transportation costs
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapLos Perales-Las Mesetas MapParticipation
-
Field Hydrocarbon CharacteristicsDiscovery SummaryReserves (2P) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Los Chancas copper mine project
A detailed analysis along the production and commercialisation chain of the Los Chancas copper mine project.
$2,250Los Toldos I Sur / Pampa de las Yeguas I
Los Toldos I Sur and Pampa de las Yeguas I are adjacent blocks operated by ExxonMobil. The operator partners with Tecpetrol and Gas y ...
$3,720Los Pelambres copper mine
A detailed analysis of the Los Pelambres copper mine.
$2,250