Los Perales-Las Mesetas
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Historic
-
Operating costs
- Transportation costs
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Los Perales-Las Mesetas Map
- Participation
- Field Hydrocarbon Characteristics
- Discovery Summary
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Production Profile
- Capital Costs Pre-2016 to 2024 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Las Ventanas (closed) copper smelter
A detailed analysis of the Ventanas copper smelter.
$2,250Los Pijiguaos bauxite mine
A detailed analysis of the Los Pijiguaos bauxite mine.
$2,250Las Mercedes bauxite mine
A detailed analysis of the Las Mecedes bauxite mine.
$2,250