Deal Insight
Mitsui and JOGMEC acquire 10% in Arctic LNG-2
Report summary
Japanese trader Mitsui and state-owned Japan Oil, Gas and Metals National Corp. have agreed to acquire a 10% stake in Arctic LNG-2 through a joint venture. NOVATEK's proposed LNG plant in West Siberia consists of three 6.6 mmtpa trains. NOVATEK is targeting FID in Q3 2019 with start-up of the first train in Q1 2023. The deal marks NOVATEK's third sell-down of interest in Arctic LNG-2. Earlier this year, Total (10%) finalised its entry in the project, and CNPC (10%) and CNOOC Ltd (10%) announced their entry. The deals are important milestones on the way to a 2019 FID and improve the project's commercial prospects.
Table of contents
- Executive summary
- Transaction details
- Upstream assets
- Deal analysis
- Upsides and risks
- Strategic rationale
- Oil & gas pricing and assumptions
Tables and charts
This report includes 6 images and tables including:
- Executive summary: Table 1
- Upstream assets: Table 1
- Deal analysis: Table 1
- Deal analysis: Table 2
- Oil & gas pricing and assumptions: Table 1
- Oil & gas pricing and assumptions: Table 2
What's included
This report contains:
Other reports you may be interested in
Asset Report
Arctic LNG-2 - Upstream
The Salmanovskoye (Utrenneye) gas-condensate field is located on the remote Gydan Peninsula in northern West Siberia. The field will ...
$3,100
Asset Report
Ufaley - closed nickel operation
A detailed analysis of the Ufaley nickel operation.
$2,250
Asset Report
Yamal LNG - Upstream
The giant South Tambeiskoye gas condensate field lies on the remote Yamal Peninsula, in West Siberia. The peninsula is the main LNG ...
$4,400