Q3 2019 pre-FID upstream project tracker: deepwater leads the way
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Q2 2025 pre-FID project tracker: major upstream projects progress despite geopolitical headwinds
Our Q2 2025 outlook for global pre-FID upstream projects.
$6,750Orca and Sul de Orca (formerly Gato do Mato)
Orca (formerly Gato do Mato) is a deepwater pre-salt oil and gas discovery located on block S-M-518 and the PSC block Sul de Orca.
$3,720Kokkola zinc smelter
A detailed analysis of the Kokkola zinc smelter.
$2,250