Rio Paez
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Ecopetrol development plans for Colombia
- Historic
- Wells
- Facilities
- Capital costs
- Operating costs
- Transportation tariffs
- Cash flow
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Global iron ore supply summary 2026
Iron ore prices average US$102.6/dmt CFR China in 2026 but ease in H2; supply expands 28 Mt, favouring low-cost producers.
$6,750Polo Rio Ventura
The Rio Ventura cluster is composed of eight fields in the Reconcavo Basin. The cluster was part of Petrobras divestment plan and was ...
$3,720Rincón (Rio Tinto)
A detailed analysis of the Rincón (Rio Tinto) lithium brine project.
$2,250