Asset Report

Rough Terminal

Get this report

$2,150

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Rough Terminal is a gas processing terminal located at the Easington facilities in Humberside. Centrica Storage, a subsidiary of Centrica, operates the terminal, which houses the processing facilities for the Rough storage unit in the Southern Gas Basin. In addition to the Rough System, the terminal is also the landing point for the Humber Gathering System (HGS). Rough storage facilityProduction at the Rough gas field started in 1976, and in 1985 following assessment of the ...

Table of contents

  • Key facts
    • Rough storage facility
  • Location maps
  • Participation
    • Terminal
    • Current pipelines
      • Rough System
      • Humber Gathering System (HGS)
  • Throughput

Tables and charts

This report includes 4 images and tables including:

  • Key facts: Table 1
  • Rough Terminal map
  • Throughput: Table 1
  • Throughput: Table 2

What's included

This report contains:

  • Document

    Rough Terminal

    PDF 2.09 MB

  • Document

    Rough Terminal

    XLS 166.00 KB