Asset Report

South East Sumatra

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The South East Sumatra PSC, located in the relatively shallow waters of the Java Sea off the southern tip of Sumatra is the largest offshore oil development in Indonesia. Oil production began in 1971, and since then over 1.3 billion barrels have been produced. The two largest fields on the PSC, Cinta and Widuri are very mature and oil output is in decline, falling from a peak of 200,000 b/d in 1991. This report includes an overview of trends and activities in the asset with analysis on cost, production, cashflow and fiscal terms.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Recent Activity
    • Historic
    • 1990s
    • 2000s
  • Well data
    • Recent activity
    • Historic activity
      • Sunda Basin
      • Asri Basin
      • Seismic
      • Exploration drilling
    • Contingent Resources
    • South East Sumatra PSC Post-2018
    • Historical production
      • Oil
      • Gas
    • Emissions
    • Key Development Metrics
    • Post-2018 extension
    • General facility summary
      • Gas
      • Other developments
    • Historical development activity
    • Secondary Recovery
      • Rama Field
      • Krisna Field
      • Widuri Field
      • Others
    • Tertiary Recovery
      • Widuri Field
    • Abandonment/Decommissioning
    • Sunda Basin
    • Asri Basin
    • Exploration Costs
    • Capital Costs
    • Operating Costs
  • Sales contracts
  • 3 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • South East Sumatra Map A
  • Well data: Table 1
  • Sales contracts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Infrastructure: Table 1
  • Infrastructure: Table 2
  • Infrastructure: Table 3
  • Costs: Table 1
  • 12 more item(s)...

What's included

This report contains:

  • Document

    South East Sumatra

    PDF 7.24 MB

  • Document

    South East Sumatra

    XLS 891.00 KB