Browse our coal reports
Access our integrated research on thermal and metallurgical coal markets, as well as detailed mine-level analysis spanning more than 1,400 assets.
Purchase by credit card or invoice
Coal reports
Wood Mackenzie Energy Transition Outlook 2020: Highlights
We are pleased to release highlights from the second annual edition of Wood Mackenzie’s Energy Transition Outlook - an entire energy and natural re...
Woori coal mine
This report has downloadable files containing asset level detail for this coal mine or coal mine project. The aim of Wood Mackenzie's coal mine ana...
Wusheng alumina refinery
Wusheng in Pinglu County started production in 2007. It has a nameplate capacity of 300ktpa and is in the second lowest quartile of our cost curve ...
Xiangwang bauxite mine
The 400kt/a Xiangwang mine is a captive supplier to the Shanxi refinery, located in Hejin City, 247km distant. Along with Xihedi and Ke'e, the Xian...
Xiaoguan bauxite mine
The 300kt/a Xiaoguan mine complex is a captive supplier to the Zhengzhou refinery (located Gongyi City in Henan Province, 33km from the mine). Wood...
Xinwang aluminium smelter
We start costing the Xinwang operation from 1998, when the operation became solely prebake. The closure of the converted Søderberg line in 2008 red...
Viewing page 253 of 280