Browse our coal reports
Access our integrated research on thermal and metallurgical coal markets, as well as detailed mine-level analysis spanning more than 1,400 assets.
Purchase by credit card or invoice
Coal reports
Wuchuan alumina refinery
We expect start up in 2014-2015. The project is part of an integrated complex, to include 2Mt/a bauxite, 800kt/a alumina, 400kt/a aluminium, 200kt/...
Yangquan alumina refinery
The 600kt/a expansion project was completed by September 2012, but commissioning was delayed to end of 2013. Bauxite and caustic soda are both capt...
Tiandong (Alumina) alumina refinery
Tiandong was commissioned in 2012 and is fully owned by Jinjiang Group. The nameplate capacity of the plant is 1.5Mtpa, consisting of two trains, a...
Lingshi (Alumina) alumina refinery
Lingshi was designed in 3 phases: two 800ktpa phases and one 1000ktpa phase. Phase one was commissioned in early 2016 and phase two in December 201...
Liulin Senze alumina refinery
The refinery was commissioned in 2009. It has several bauxite mines within 100km of the plant. SGA is sold to local smelters while NMA is supplied ...
Mettur Dam alumina refinery
Production ceased in 2009, a year after the closure of the adjacent smelter. We have no base case restart. Wood Mackenzie’s asset reports are built...
Viewing page 51 of 269