Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Chalco Qinghai aluminium smelter
The smelter was commissioned in 1987. The two smelters are costed as a single entity. Wood Mackenzie’s asset reports are built from the bottom up, ...
Chalco Shandong aluminium smelter
At the time of closure in August 2013, we estimate that the smelter had the highest power tariff and C1 costs in the world. Wood Mackenzie’s asset ...
Uralsk (P) aluminium smelter
The prebake lines were commissioned in 1994 to eventually replace the Søderberg lines, which came online in 1939. The Søderberg lines closed in 200...
Uralsk (S) aluminium smelter
The Søderberg lines were closed in 2009. Uralsk is now an exclusively prebake technology operation. Wood Mackenzie’s asset reports are built from t...
Velardena zinc mine
Velardeña operates (2022) a poly-metallic underground mine and a 2.8Mt/a ore mill. The project restarted in May 2013 and included an underground mi...
Veles zinc smelter
The ISF smelter at Veles was commissioned in October 1973 with a capacity of 65kt/a ISF zinc and 35kt/a lead. In June 2003 the smelter was "tempora...
Viewing page 416 of 448