Mukran Phase 2 Energos Power, formally known as Lubmin FSRU Dynagas, is an under construction regas terminal at the Mukran port, Rügen Island, Germany. The terminal is expected to start by July 2024. The port was initially planned at the port of Lubmin, and afterwards, the location changed to Mukran port in Germany. The port of Lubmin has several advantages and disadvantages for deploying an FRSU. It is the terminus of the Nord Stream 1 and 2 pipelines, which is close to the existing ...
Table of contents
- Key facts
- Location maps
- Terminal overview
- Utilisation
- Operational basis
- Offtake
- Tariffs
- Future expansions
Tables and charts
This report includes 4 images and tables including:
- Key facts: Table 1
- Key facts: Table 2
- Key facts: Table 3
- Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Mukran Phase 1 Neptune
Mukran Phase 1 Neptune (Deutsche Ostee LNG import terminal) is a floating regas terminal located at the port of Lubmin, in the Bay of ...
$1,200
Asset Report
Johan Sverdrup
The giant Johan Sverdrup oil field is located in the Central North Sea in the Utsira High play. Johan Sverdrup is the third largest oil ...
$5,750
Asset Report
Captain
The Captain heavy oil field is situated in the Outer Moray Firth, 145 kilometres northeast of Aberdeen. The initial development ...
$3,100