Asset Report

Cartagena (Escombreras) zinc smelter project

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Cartagena (Escombreras) zinc smelter project was part of a recovery plan put in place for the then existing Cartagena smelter owned by Española del Zinc. The project involved the construction of a new smelter to operate by entirely treating secondary materials from steel recycling plants. It was proposed to commission in late 2011 with a production capacity of 65kt/a but Española del Zinc was declared insolvent the year before.

Table of contents

  • Summary
  • Key Issues
  • Location / Transport
  • Conc. Receipt / Storage
  • Roaster
  • Acid Plant
  • Leach Plant
  • Purification
  • Tankhouse
  • Casting Plant
  • Residue Disposal

Tables and charts

This report includes 2 images and tables including:

  • Detailed map
  • Potential Flowsheet

What's included

This report contains:

  • Document

    Cartagena (Escombreras) zinc smelter project

    PDF 1.18 MB