Asset Report

Heding copper refinery

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Heding copper smelter and refinery was started in December 2010 and the refinery was commissioned in June 2014 with a nameplate capacity of 135 ktpa. In 2017, the refinery was expanded to 350 ktpa. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Emissions

Tables and charts

This report includes 3 images and tables including:

  • Heding Copper Refinery Emission Intensity Quartile Ranking - total global production - tonnes Cu

What's included

This report contains:

  • Document

    Heding copper refinery

    PDF 1.67 MB

  • Document

    Heding (Copper) copper refinery

    ZIP 1.23 MB