Asset Report

Hellyer Tailings zinc smelter project

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Hellyer zinc-lead mine was owned by Western Metals from 1998.  In 2000 the mine closed, leaving a large potential mine of tailings which contain relatively useful levels of zinc, lead, silver and gold.  Intec Ltd. bought the Hellyer tailings from the Western Metals' receivers for US$1M in January 2004.  Intec developed and have patented the Intec Zinc Process, which is based on the same chemistry as the Intec Copper Process, that being the use of the mixed halide species BrCl2-.  It was...

What's included

This report contains

  • Document

    Hellyer Tailings zinc smelter project

    PDF 480.31 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plan
    • Residue Disposal
    • Other
  • Products

Tables and charts

This report includes 3 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Location maps: Image 1
  • Flowsheet

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800