Asset Report
Youxi Jindong zinc mine
Report summary
Youxi Jindong zinc mine is located in Youxi County, Fujian Province. It is an underground polymetallic mine producing zinc concentrate and lead concentrate. The Phase II expansion was commissioned in 2012, increasing the capacity from 700 tpd to 1,200 tpd. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key Issues
- Mining
- Milling
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Hellyer Mine Restart (Closed) zinc mine
A detailed analysis of the Hellyer Mine Restart zinc mine.
$2,250
Asset Report
Andaychagua zinc mine
A detailed production, commercial and costs analysis of the Andaychagua zinc mine.
$2,250
Asset Report
San Martin Restart zinc mine project
A detailed analysis along the production and comercialisation chain of the San Martin Restart zinc mine project
$2,250