B5/27 (Jasmine)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
Emissions
- Key development metrics
- Wellhead production platform Jasmine A and pipeline summary
- Wellhead production platform Jasmine B and pipeline summary
- Wellhead production platform Jasmine C and pipeline summary
- Wellhead production platform Jasmine D and pipeline summary
- Wellhead production platform Ban Yen A and pipeline summary
- Subsea summary
- FPSO summary
- 1 more item(s)...
- Exploration Costs
-
Capital Costs
- Development
-
Operating Costs
- Royalty To Previous Owner
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- B5/27 Map
- Participation
- Reserves (2P) at 01/01/2026
- Production (2015-2024)
- Jasmine field production profile
- Exploration Costs 2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Hangingstone (AOC)
The Hangingstone project is located in the Athabasca oil sands region of Alberta, 20 kilometres to the southwest of Fort McMurray. The ...
$3,720Tonglvshan copper mine
A detailed analysis of the Tonglvshan copper mine.
$2,250Wetar copper mine
A detailed analysis of the Wetar copper mine.
$2,250