B5/27 (Jasmine)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
Emissions
- Key development metrics
- Wellhead production platform Jasmine A and pipeline summary
- Wellhead production platform Jasmine B and pipeline summary
- Wellhead production platform Jasmine C and pipeline summary
- Wellhead production platform Jasmine D and pipeline summary
- Wellhead production platform Ban Yen A and pipeline summary
- Subsea summary
- FPSO summary
- 1 more item(s)...
- Exploration Costs
-
Capital Costs
- Development
-
Operating Costs
- Royalty To Previous Owner
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- B5/27 Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Jasmine field production profile
- Exploration Costs 2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
La Calera
La Calera is Pluspetrol's first Vaca Muerta project. The block has an advantageous location close to Loma Campana and Fortin de ...
$3,720Weiqiao aluminium smelter
A detailed analysis of the Weiqiao aluminium smelter.
$2,250Sichuan Qiya (E'meishan) aluminium smelter
A detailed analysis of the Sichuan Qiya (E'meishan) aluminium smelter.
$2,250