Asset report

EPSA Area F (NC118-A)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Block NC118 is located in the Ghadames Basin of northwest Libya and is operated by Eni. The block contains two fields NC118 A and NC118 D discovered in 1995 and 2001 respectively. A development licence was granted for the field in 2008. First production from the field was initially planned in 2012 through a leased Early Production System (EPS). This was delayed to 2013 and following the Libyan conflict in 2011 the project has been suspended due to ongoing security issues.

What's included

This report contains

  • Document

    EPSA Area F (NC118-A)

    PDF 5.02 MB

  • Document

    EPSA Area F (NC118-A)

    XLS 412.00 KB

  • Document

    EPSA Area F (NC118-A)

    ZIP 5.37 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Exploration
  • Reserves and resources
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 11 images and tables including:

Images

  • Index Map
  • NC118 Map

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Exploration: Table 1
  • Reserves and resources: Table 1
  • Infrastructure: Table 1
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Economic analysis: Table 1

You may be interested in

Asset report

West El Manzala

Asset report

Chouech Es Saida

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898