LUKOIL buys Cairn's stake in Senegal's Sangomar for up to US$400 million
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Executive summary
- Transaction details
- Upstream assets
- Deal analysis
- Upsides and risks
- Strategic rationale
- Oil & gas pricing and assumptions
Tables and charts
This report includes the following images and tables:
- Executive summary: Table 1
- Transaction details: Table 1
- Map
- Upstream assets: Table 1
- Deal analysis: Table 1
- Deal analysis: Table 2
- Deal analysis: Table 3
- Oil & gas pricing and assumptions: Table 1
- Oil & gas pricing and assumptions: Table 2
What's included
This report contains:
Other reports you may be interested in
Ntaka Hill nickel project
A detailed analysis of the Ntaka Hill nickel project.
$2,250Boffa bauxite mine
A detailed analysis of the Boffa bauxite mine in Guinea.
$2,250Bel Air bauxite mine
The Bel Air project is a standalone direct shipping ore supplier. The mine is close to the coast and costs to fob are therefore competitive.
$2,250