Asset Report
North Bahariya
This report is currently unavailable
Report summary
The North Bahariya concession is located in the Western Desert over an eastern extension of the Abu Gharadig Basin, close to Apache's prolific East Bahariya Block. The concession includes six oil fields, Abrar, Abrar South, Ferdaus, Ganna, Rawda and Rayan split over two blocks. Abrar was discovered in 2000 and brought onstream four years later. Following Apache's exploration success on the adjacent East Bahariya Block, Sahara Oil & Gas undertook further exploration and made six ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Reserves and resources
- Production
-
Development
- Facilities
- Key Development Metrics
-
Costs
- Exploration costs
- Capital costs
- Operating Costs
-
Fiscal and regulatory
- Cost/Profit Oil
- Bonuses
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Oil price
- Global Economic Model (GEM) File
-
Economic analysis
-
Cash Flow
- North Bahariya contract
- North Bahariya post-contract
-
Cash Flow
Tables and charts
This report includes 36 images and tables including:
- Key facts: Table 1
- Index Map
- North Bahariya Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- Production Profile
- Post-Contract Production Profile
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
- Fiscal and regulatory: Table 3
- Economic analysis: Table 1
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- Economic analysis: Table 4
- Economic analysis: Table 5
- Economic analysis: Table 6
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Economic analysis: Table 7
- Remaining PV Price Sensitivities
What's included
This report contains:
Other reports you may be interested in
Asset Report
North West Shelf LNG - upstream
The North West Shelf Project (NWS) is a giant offshore gas project in the North Carnarvon Basin, Western Australia. Sanctioned in 1980, ...
$5,750
Asset Report
North Sabah
The North Sabah PSC was awarded in November 1996. Oil is transported via a series of pipelines to a terminal on Labuan Island.
$3,100
Asset Report
North Malay Basin Gas Project
The first phase of the North Malay Basin Gas Project involved the installation of an Early Production System (EPS) …
$3,100