Browse our coal reports
Access our integrated research on thermal and metallurgical coal markets, as well as detailed mine-level analysis spanning more than 1,400 assets.
Purchase by credit card or invoice
Coal reports
Aditya aluminium smelter
Aditya was commissioned in 2013 with a capacity of 360ktpa. Anodes and power are captive, while SGA is sourced within the company system. Wood Mack...
Indexim Coalindo coal mine
This report has downloadable files containing asset level detail for this coal mine or coal mine project. The aim of Wood Mackenzie's coal mine ana...
Shaoguan (ISF) zinc smelter
No1 ISF was commissioned in 1976 and No.2 in 1996, the plant then comprised two complete streams of sinter plant - blast furnace - zinc refinery. I...
Onsan zinc smelter
The zinc smelter located in Onsan, near Ulsan in South Korea is operated by Korea Zinc and has a slab zinc capacity of 560kt/a. The Onsan flowsheet...
Middle East conflict: implications for thermal generation & fuel switching in Europe
As the disruption of energy supplies from the Middle East continues, we consider whether the inherent flexibility of gas and coal generation contin...
Perspectives - Metals and Mining - April 2026
At the outset of the year, there was little to suggest how rapidly tensions in a narrow Middle Eastern strait would escalate and impact metal marke...
Viewing page 35 of 270